A printed bar chart with pencils on top

Forecasting & planning

The forecast that is really last year plus ten per cent

You're planning demand, cash and headcount on a hunch with a spreadsheet around it.

Today

  1. 1Last year plus ten percent
    someone moves it
  2. 2Seasonality in someone's head
    someone moves it
  3. 3Nobody scores it after

Rebuilt

  1. 1Built on your own history
  2. 2A range, not a number
  3. 3Accuracy tracked over time
The same process, before and after. The left column is where the time goes.

How it runs today

  • A forecast built once a year in a spreadsheet, and quietly abandoned by March.
  • Method is last year's actuals with a growth percentage applied.
  • Seasonality, promotions, weather and pipeline live in people's judgment, not the model.
2 more →
  • Nobody scores the forecast afterwards, so nobody knows if it was any good.
  • Stock-outs and overstock are both routine, and treated as bad luck.

Signs it costs more than you think

  • You hold safety stock because you don't trust the forecast, and it still runs out.
  • Cash surprises happen, in both directions.
  • Hiring and capacity decisions are made reactively, at the worst possible price.
2 more →
  • Two departments plan off different assumptions and neither knows.
  • Nobody can tell you last quarter's forecast error.

What it becomes

  • Forecasting at the level decisions are made — SKU, site, week, skill
  • Ranges and confidence, not a single misleading number
  • Driver-aware: seasonality, promotions, pipeline, weather, lead times
  • Human override, recorded and scored against the model
  • Forecast accuracy tracked over time, by product, region and horizon
The full picture, and what it connects to →

Forecasting becomes a running system rather than an annual document. It learns from your own history — including the seasonality and the promotions and the weather effects people carry in their heads — and it forecasts at the level decisions are actually made: this SKU at this location, this week; cash by week rather than by quarter; capacity by skill rather than headcount. It publishes a range, not a single number, because the range is what tells you how much slack to hold. Human overrides are first-class, recorded and scored alongside the model. And every forecast is graded against what happened, so accuracy is a tracked number that improves rather than an article of faith.

  • Sales, order and POS history — the raw material
  • Inventory and purchasing, so a forecast becomes a replenishment suggestion
  • Finance, for cash-flow and budget alignment
  • CRM pipeline, where demand starts as an opportunity

The first release

A forecast for one decision — replenishment for a product family, or thirteen-week cash — backtested against your own history so you can see how it would have performed before you rely on it. Usually two weeks, most of it spent on the data rather than the model.

Want this as a one-pager?

We'll send a single page on this process — what it costs to leave alone, what the rebuilt version does, and what a first release would involve. No sequence, no wizard.

One email about this process. Nothing else.

Others in data & decisions

Let's build

What's your AI Nirvana?

Tell us where you want to go. We'll bring the team, build the product, and grow it with you — and you own it.

  • You own the IP
  • US-based team
  • Reply within 1 business day