
Maintenance & asset uptime
The machine that tells you it's broken by breaking
Maintenance is scheduled around when it last failed.
Today
- 1Fixed-interval schedulesomeone moves it
- 2Breakdown reported by phonesomeone moves it
- 3History in a folder
Rebuilt
- 1Driven by real usage
- 2Work order with its parts
- 3Cost per asset, visible
How it runs today
- A maintenance schedule in a spreadsheet, based on fixed intervals set at purchase.
- Breakdowns are reported by phone and triaged by whoever picks up.
- Asset history is a folder of job sheets, if the job sheets were kept.
2 more →
- Spare parts are ordered when the machine is already down.
- Nobody can say which assets cost the most to keep running.
Signs it costs more than you think
- Unplanned downtime is a normal part of the week rather than an incident.
- You service equipment that doesn't need it and miss equipment that does.
- The same asset fails repeatedly and nobody has connected the occurrences.
2 more →
- Warranty claims are missed because nobody knew the asset was still covered.
- Replace-or-repair decisions are made on instinct, not on lifetime cost.
What it becomes
- One record per asset — history, documents, warranty, parts, cost to date
- Usage-, condition- or calendar-driven schedules, whichever fits the asset
- Automatic work orders with checklist and parts attached
- Structured breakdown reporting with photos, from whoever finds it
- Downtime, MTBF and cost-per-asset reporting for repair-or-replace decisions
The full picture, and what it connects to →
Every asset gets a real record: its history, its documents, its warranty, its parts and its cost of ownership to date. Maintenance is then driven by whichever signal is most honest for that asset — runtime hours, cycles, mileage, condition readings, or a calendar where nothing better exists — and the work order is raised automatically with the parts and the checklist attached. Breakdown reporting becomes a structured intake with photos rather than a phone call, so triage is consistent and the fix history accumulates. Over a year the useful thing is not the scheduling; it is the cost-per-asset picture, which turns repeated repairs and replacement decisions from a debate into an arithmetic problem.
- Inventory, so a scheduled job reserves its parts in advance
- Scheduling and dispatch, so maintenance competes fairly for engineer time
- Finance, for asset value, depreciation and lifetime cost
- Telemetry or IoT feeds where the asset can report its own condition
The first release
The asset register migrated with history attached, plus automatic scheduling and work orders for one asset class, in one to two weeks. Condition-based triggers come later, once there is enough recorded history to know which signal actually predicts failure.
Others in operations
Let's build
What's your AI Nirvana?
Tell us where you want to go. We'll bring the team, build the product, and grow it with you — and you own it.
- You own the IP
- US-based team
- Reply within 1 business day

